The Space Coast is anticipating between 100,000-200,000 people are expected to descend on Brevard County for the #Artemis launch from NASA's Kennedy Space Center on September 03, 2022, with a 2 hour launch window opening at 2:17 pm. Visit /space three hours before each window opening for live video and real-time updates.Live NASA Feed ▪ Viewing Location Map ▪ FDOT Traffic Maps ▪ Titusville Viewing ▪ Port Canaveral Parking ▪ Jetty Park ▪ Merritt Island Wildlife Refuge ▪ Cocoa Village Viewing ▪ Brevard County Parks ▪ Boating Information ▪ Kennedy Space Center Visitor Complex ▪ Streaming Options ▪ Audio Only Streams ▪ Alert Notification Sign-up ▪ More Information Follow him on Twitter, Facebook and Instagram at Launch Windows for Artemis I That's expected sometime between 20.įor the latest, visit /launchschedule.Ĭontact Emre Kelly at or 32. If everything goes well with Artemis II, two yet-to-be-named astronauts will touch down on the lunar surface for Artemis III. 27 liftoff, meanwhile, translates to a mission duration of 39 days. 23, that would mean a 25-day mission a Sept. The Orion capsule secured atop SLS is responsible for an autonomous mission to the moon and back, potentially paving the way for astronauts to do the same on Artemis II no earlier than 2024. "The launch criteria for each vehicle are used to develop mission rules that govern the allowable flight behavior to ensure public safety, which is the foremost job of the Eastern Range." "Space Launch Delta 45, operator of the Eastern Range, is in discussions with NASA to review its request for an extension of the certification of the Space Launch System rocket's Flight Termination System," SLD 45 said in a statement. That process, which takes at least four days on either end plus time in the VAB itself, would add several weeks to the timeline and likely push launch to no earlier than the second half of October. So even if teams fix the hydrogen leak issue at pad 39B, they might still need to roll the rocket back to its home in the VAB if the Space Force can't grant an extension. Officials said they submitted FTS extension requests with the range and are waiting for a response. The military branch, which oversees Kennedy Space Center and Cape Canaveral Space Force Station in an area known as the Eastern Range, is ultimately responsible for public safety. Because the latest battery inspection expiry date already passed this week, officials said they are exploring options with the Space Force. The batteries responsible for the FTS, NASA said, must be tested every 20 to 25 days – work that can only be done in the Vehicle Assembly Building. this mission begs the use of hydrogen."īut pushing forward with either of those launch windows depends on the second hardware issue: Re-certifying the flight termination system, or FTS, that is designed to deliberately destroy the SLS rocket in the event of an emergency. "Hydrogen is the highest-performance molecule. "There's no question that hydrogen is a challenging molecule, but it's worth it," John Blevins, SLS chief engineer, said during a Thursday briefing with reporters. Several factors are at play, especially when it comes to running supercooled hydrogen through lines exposed to the warm Florida environment. The SLS rocket's RS-25 main engines are leftovers from the space shuttle era, during which the agency also dealt with fueling issues. Liquid hydrogen is a powerful rocket fuel, but can be challenging to work with. More: KSC Visitor Complex offers limited-time ticket specials for September NASA's huge Artemis launch: It's going to be loud, but how loud? That depends SLS uses supercooled liquid hydrogen and oxygen for its propellants. 17 if that goes well, teams will set up for a Sept. NASA will conduct a fueling test on Sept. Officials on Thursday said engineers will remove and further inspect the main seal in that system, which was found to have a small "notch" or tear. During the last attempt at launching SLS and its uncrewed Orion capsule last week, officials noticed a significant hydrogen leak and were not able to get the tank beyond 11% filled, forcing a scrub.Īt pad 39B, engineers have constructed a protective tent around the lower portions of the SLS rocket in an attempt to fix the leak narrowed down to a hydrogen quick-disconnect. Making either of those two dates work depends on several factors.įirst, teams must fix and test liquid hydrogen leak issues at pad 39B.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |